Institutional mechanisms for water supply to informal settlements in Zambia a grounded theory approach

dc.contributor.advisorMichell, Kathyen_ZA
dc.contributor.advisorCattell, Keithen_ZA
dc.contributor.authorBanda, Ian Nzalien_ZA
dc.date.accessioned2014-07-31T10:34:27Z
dc.date.available2014-07-31T10:34:27Z
dc.date.issued2013en_ZA
dc.descriptionIncludes abstract.
dc.descriptionIncludes bibliographical references.
dc.description.abstractEffective provision of water services to informal settlements in Zambia has, andcontinues to challenge policy makers and those mandated to provide this service.Despite effecting widespread reforms for the sector in the mid to late 1990’s witha prime intent of rapidly reinvigorating the sector, problems still remain as vastnumbers of the informal settlement populace continue to live without adequateand sustained access to clean water. The complex nature of these informalsettlements has been cited as one of the key factors responsible for this situationin that the housing units are constructed devoid of any municipal planning andcontrol; are poorly constructed; and, not laid out in a systematic geometric arraywhich is essential for effective provision of modern water reticulationinfrastructure. Other factors include challenges by the service providers tomobilise resources required to install the network infrastructure and also theirinability to fully meet and recover their operational costs. The literature reviewquestioned whether other actors should be willingly allowed to participate in orderto augment service provision and also whether provision of incentives to theservice providers would serve to eradicate this condition of poor service delivery.The research was undertaken using a grounded theory approach within thesocial constructivist paradigm which is most suited where there is an absence oftheory to underpin the research area, or where the existent knowledge base inthe particular area is devoid of any theoretical foundation. The methods of datacollection included focus group discussions and in-depth semi-structuredinterviews. The research revealed that existing service delivery approaches tothese areas needs to be remodelled primarily through overhaul of the existentpolicy framework, if they are to fully cater for the various operational impedimentsinherent in informal settlements. Other findings included the requirement ofoperational incentives to entice the service providers to service these areas andthe formation of ‘quad partnerships’ through which to render services. Thetheoretical propositions (key cornerstones) for informal settlement water supplystated in this research were derived and assembled from these key findings.en_ZA
dc.identifier.apacitationBanda, I. N. (2013). <i>Institutional mechanisms for water supply to informal settlements in Zambia a grounded theory approach</i>. (Thesis). University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Construction Economics and Management. Retrieved from http://hdl.handle.net/11427/5071en_ZA
dc.identifier.chicagocitationBanda, Ian Nzali. <i>"Institutional mechanisms for water supply to informal settlements in Zambia a grounded theory approach."</i> Thesis., University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Construction Economics and Management, 2013. http://hdl.handle.net/11427/5071en_ZA
dc.identifier.citationBanda, I. 2013. Institutional mechanisms for water supply to informal settlements in Zambia a grounded theory approach. University of Cape Town.en_ZA
dc.identifier.ris TY - Thesis / Dissertation AU - Banda, Ian Nzali AB - Effective provision of water services to informal settlements in Zambia has, andcontinues to challenge policy makers and those mandated to provide this service.Despite effecting widespread reforms for the sector in the mid to late 1990’s witha prime intent of rapidly reinvigorating the sector, problems still remain as vastnumbers of the informal settlement populace continue to live without adequateand sustained access to clean water. The complex nature of these informalsettlements has been cited as one of the key factors responsible for this situationin that the housing units are constructed devoid of any municipal planning andcontrol; are poorly constructed; and, not laid out in a systematic geometric arraywhich is essential for effective provision of modern water reticulationinfrastructure. Other factors include challenges by the service providers tomobilise resources required to install the network infrastructure and also theirinability to fully meet and recover their operational costs. The literature reviewquestioned whether other actors should be willingly allowed to participate in orderto augment service provision and also whether provision of incentives to theservice providers would serve to eradicate this condition of poor service delivery.The research was undertaken using a grounded theory approach within thesocial constructivist paradigm which is most suited where there is an absence oftheory to underpin the research area, or where the existent knowledge base inthe particular area is devoid of any theoretical foundation. The methods of datacollection included focus group discussions and in-depth semi-structuredinterviews. The research revealed that existing service delivery approaches tothese areas needs to be remodelled primarily through overhaul of the existentpolicy framework, if they are to fully cater for the various operational impedimentsinherent in informal settlements. Other findings included the requirement ofoperational incentives to entice the service providers to service these areas andthe formation of ‘quad partnerships’ through which to render services. Thetheoretical propositions (key cornerstones) for informal settlement water supplystated in this research were derived and assembled from these key findings. DA - 2013 DB - OpenUCT DP - University of Cape Town LK - https://open.uct.ac.za PB - University of Cape Town PY - 2013 T1 - Institutional mechanisms for water supply to informal settlements in Zambia a grounded theory approach TI - Institutional mechanisms for water supply to informal settlements in Zambia a grounded theory approach UR - http://hdl.handle.net/11427/5071 ER - en_ZA
dc.identifier.urihttp://hdl.handle.net/11427/5071
dc.identifier.vancouvercitationBanda IN. Institutional mechanisms for water supply to informal settlements in Zambia a grounded theory approach. [Thesis]. University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Construction Economics and Management, 2013 [cited yyyy month dd]. Available from: http://hdl.handle.net/11427/5071en_ZA
dc.language.isoengen_ZA
dc.publisher.departmentDepartment of Construction Economics and Managementen_ZA
dc.publisher.facultyFaculty of Engineering and the Built Environment
dc.publisher.institutionUniversity of Cape Town
dc.subject.otherConstruction Economics and Managementen_ZA
dc.titleInstitutional mechanisms for water supply to informal settlements in Zambia a grounded theory approachen_ZA
dc.typeDoctoral Thesis
dc.type.qualificationlevelDoctoral
dc.type.qualificationnamePh Den_ZA
uct.type.filetypeText
uct.type.filetypeImage
uct.type.publicationResearchen_ZA
uct.type.resourceThesisen_ZA
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
thesis_ebe_2013_banda_ian_nzali.pdf
Size:
2.88 MB
Format:
Adobe Portable Document Format
Description:
Collections