Impediments to the implementation of value management technique in the public sector projects in Eastern Cape

dc.contributor.advisorMassyn, Mark
dc.contributor.authorMpofu, Sunboy
dc.date.accessioned2024-07-05T12:53:17Z
dc.date.available2024-07-05T12:53:17Z
dc.date.issued2024
dc.date.updated2024-07-05T11:14:42Z
dc.description.abstractPurpose - Construction projects in Provisional Government authorities in South Africa are vital vehicle for social economic development of the community. In achievement of best and viable projects, value management technique should be deployed from the beginning to the end of the project. This research investigated the impediments to the adoption of value management technique studies in the public sector projects. The aim is to identify impediment factors to the adoption of Value management technique Studies in the public sector projects in the Eastern Cape Province in South Africa Design - In addition to the literature review that was conducted and identified a number of impediment factors to the adoption of Value management technique in the public sector in other countries such as Malaysia, China and Hong Kong, A semi structured interview was conducted with key Heads of Eastern Cape Department of Publics works to get their views. A web survey with a number of impediment factors identified by the interviewers and those identified in the literature review was sent to Built environment professionals who work with Eastern Cape Provisional Government in deferent capacities. Findings – The research find identified that, Incompetent Skilled Personnel, Lack of training and Education in Value management technique, Political Influence, Lack of Awareness about Value management technique, Bureaucracy with government and lack of practical guideline for implementation of Value management technique are overwhelmingly the main impediment factors to the adoption of Value management technique study in the public sector projects in the Eastern Cape province of South Africa. Practical Implications - The findings revealed critical key issues that need to be addressed so that the benefits of implementation of Value management technique CON5023Z Page 3 may be realised however, the findings and the research process had some limitations. The sample for the survey was chosen from a population of Eastern Cape Province of South Africa. The outcome of the survey is not always a true representation of the entire country as this was limited to one province. It therefore implies that further research studies might be required using a bigger sample size spanning various and different levels of government and provinces. The research findings may also need to be confirmed with more qualitative methods.
dc.identifier.apacitationMpofu, S. (2024). <i>Impediments to the implementation of value management technique in the public sector projects in Eastern Cape</i>. (). ,Faculty of Engineering and the Built Environment ,Department of Construction Economics and Management. Retrieved from http://hdl.handle.net/11427/40359en_ZA
dc.identifier.chicagocitationMpofu, Sunboy. <i>"Impediments to the implementation of value management technique in the public sector projects in Eastern Cape."</i> ., ,Faculty of Engineering and the Built Environment ,Department of Construction Economics and Management, 2024. http://hdl.handle.net/11427/40359en_ZA
dc.identifier.citationMpofu, S. 2024. Impediments to the implementation of value management technique in the public sector projects in Eastern Cape. . ,Faculty of Engineering and the Built Environment ,Department of Construction Economics and Management. http://hdl.handle.net/11427/40359en_ZA
dc.identifier.ris TY - Thesis / Dissertation AU - Mpofu, Sunboy AB - Purpose - Construction projects in Provisional Government authorities in South Africa are vital vehicle for social economic development of the community. In achievement of best and viable projects, value management technique should be deployed from the beginning to the end of the project. This research investigated the impediments to the adoption of value management technique studies in the public sector projects. The aim is to identify impediment factors to the adoption of Value management technique Studies in the public sector projects in the Eastern Cape Province in South Africa Design - In addition to the literature review that was conducted and identified a number of impediment factors to the adoption of Value management technique in the public sector in other countries such as Malaysia, China and Hong Kong, A semi structured interview was conducted with key Heads of Eastern Cape Department of Publics works to get their views. A web survey with a number of impediment factors identified by the interviewers and those identified in the literature review was sent to Built environment professionals who work with Eastern Cape Provisional Government in deferent capacities. Findings – The research find identified that, Incompetent Skilled Personnel, Lack of training and Education in Value management technique, Political Influence, Lack of Awareness about Value management technique, Bureaucracy with government and lack of practical guideline for implementation of Value management technique are overwhelmingly the main impediment factors to the adoption of Value management technique study in the public sector projects in the Eastern Cape province of South Africa. Practical Implications - The findings revealed critical key issues that need to be addressed so that the benefits of implementation of Value management technique CON5023Z Page 3 may be realised however, the findings and the research process had some limitations. The sample for the survey was chosen from a population of Eastern Cape Province of South Africa. The outcome of the survey is not always a true representation of the entire country as this was limited to one province. It therefore implies that further research studies might be required using a bigger sample size spanning various and different levels of government and provinces. The research findings may also need to be confirmed with more qualitative methods. DA - 2024 DB - OpenUCT DP - University of Cape Town KW - Project Management LK - https://open.uct.ac.za PY - 2024 T1 - Impediments to the implementation of value management technique in the public sector projects in Eastern Cape TI - Impediments to the implementation of value management technique in the public sector projects in Eastern Cape UR - http://hdl.handle.net/11427/40359 ER - en_ZA
dc.identifier.urihttp://hdl.handle.net/11427/40359
dc.identifier.vancouvercitationMpofu S. Impediments to the implementation of value management technique in the public sector projects in Eastern Cape. []. ,Faculty of Engineering and the Built Environment ,Department of Construction Economics and Management, 2024 [cited yyyy month dd]. Available from: http://hdl.handle.net/11427/40359en_ZA
dc.language.rfc3066Eng
dc.publisher.departmentDepartment of Construction Economics and Management
dc.publisher.facultyFaculty of Engineering and the Built Environment
dc.subjectProject Management
dc.titleImpediments to the implementation of value management technique in the public sector projects in Eastern Cape
dc.typeThesis / Dissertation
dc.type.qualificationlevelMasters
dc.type.qualificationlevelMSc
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
thesis_ebe_2024_mpofu sunboy.pdf
Size:
1.74 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.72 KB
Format:
Item-specific license agreed upon to submission
Description:
Collections