Towards an independent system operator for South Africa

dc.contributor.authorPickering, Mark
dc.date.accessioned2016-02-01T09:11:23Z
dc.date.available2016-02-01T09:11:23Z
dc.date.issued2010
dc.date.updated2016-02-01T08:11:39Z
dc.description.abstractPurpose of the report: This report considers the implementation of an independent system operator (ISO) in South Africa. In particular the report examines the key functions that an ISO would need to perform in the light of major policy choices facing the country. Methodology: This research was undertaken at a stage when the South African government had only made very brief policy statements about its intention to establish an ISO. No detailed discussion documents, government policy or draft legislation were available to the public. The research was therefore based on interviews with informed individuals, a review of various confidential draft policy documents and a limited review of the international literature. Terminology: Government initially used the term ‘independent system operator’. Strictly speaking this is probably not the correct term given the range of functions under consideration. Government subsequently shifted to ‘independent system and market operator’. If government plans to include transmission functions within the new entity it may be more appropriate to rather refer to ‘transmission system operator’, ‘national grid company’ or some variation of these. For the sake of consistency and clarity, ISO is throughout the report, focusing on the underlying functions to be performed.en_ZA
dc.identifier.apacitationPickering, M. (2010). <i>Towards an independent system operator for South Africa</i> University of Cape Town ,Faculty of Engineering & the Built Environment ,Energy Research Centre. Retrieved from http://hdl.handle.net/11427/16614en_ZA
dc.identifier.chicagocitationPickering, Mark <i>Towards an independent system operator for South Africa.</i> University of Cape Town ,Faculty of Engineering & the Built Environment ,Energy Research Centre, 2010. http://hdl.handle.net/11427/16614en_ZA
dc.identifier.citationPickering, M. (2010). Towards an independent system operator for South Africa. Meridian Economics, Prepared for Energy Research Centre, University of Cape Town.en_ZA
dc.identifier.ris TY - Working Paper AU - Pickering, Mark AB - Purpose of the report: This report considers the implementation of an independent system operator (ISO) in South Africa. In particular the report examines the key functions that an ISO would need to perform in the light of major policy choices facing the country. Methodology: This research was undertaken at a stage when the South African government had only made very brief policy statements about its intention to establish an ISO. No detailed discussion documents, government policy or draft legislation were available to the public. The research was therefore based on interviews with informed individuals, a review of various confidential draft policy documents and a limited review of the international literature. Terminology: Government initially used the term ‘independent system operator’. Strictly speaking this is probably not the correct term given the range of functions under consideration. Government subsequently shifted to ‘independent system and market operator’. If government plans to include transmission functions within the new entity it may be more appropriate to rather refer to ‘transmission system operator’, ‘national grid company’ or some variation of these. For the sake of consistency and clarity, ISO is throughout the report, focusing on the underlying functions to be performed. DA - 2010 DB - OpenUCT DP - University of Cape Town KW - Electricity distribution KW - Electricity supply KW - South Africa LK - https://open.uct.ac.za PB - University of Cape Town PY - 2010 T1 - Towards an independent system operator for South Africa TI - Towards an independent system operator for South Africa UR - http://hdl.handle.net/11427/16614 ER - en_ZA
dc.identifier.urihttp://hdl.handle.net/11427/16614
dc.identifier.vancouvercitationPickering M. Towards an independent system operator for South Africa. 2010 [cited yyyy month dd]. Available from: http://hdl.handle.net/11427/16614en_ZA
dc.languageengen_ZA
dc.publisher.departmentEnergy Research Centreen_ZA
dc.publisher.facultyFaculty of Engineering and the Built Environment
dc.publisher.institutionUniversity of Cape Town
dc.subjectElectricity distributionen_ZA
dc.subjectElectricity supplyen_ZA
dc.subjectSouth Africaen_ZA
dc.titleTowards an independent system operator for South Africaen_ZA
dc.typeWorking Paperen_ZA
uct.type.filetypeText
uct.type.filetypeImage
uct.type.publicationResearchen_ZA
uct.type.resourceResearch paperen_ZA
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Pickering_Towards_an_independent_2010.pdf
Size:
1.1 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.72 KB
Format:
Item-specific license agreed upon to submission
Description:
Collections