A feasibility study for an IMC application in the mining industry
Master Thesis
1994
Permanent link to this Item
Authors
Supervisors
Journal Title
Link to Journal
Journal ISSN
Volume Title
Publisher
Publisher
University of Cape Town
Department
License
Series
Abstract
This project is a feasibility study using Internal Model Control strategies to optimise the performance of a secondary and tertiary crusher stage at a mine. First, a mathematical model of the plant is_ extracted and simulated. The viability of using IMC on an unstable process is considered. Various general objectives are then explained, whereafter the manually controlled plant is evaluated. Three strategies are proposed that control the bin levels to optimise buffer capacity so that crusher throughput is increased and efficiency improved. These are tested on a simulator fed with real plant data to reveal their properties. Finally, an implementation scheme is then proposed.
Description
Bibliography: leaves 150-160.
Keywords
Reference:
Hacker, R. 1994. A feasibility study for an IMC application in the mining industry. University of Cape Town.