Prefeasibility study for a small hydro project

Master Thesis

2010

Permanent link to this Item
Authors
Supervisors
Journal Title
Link to Journal
Journal ISSN
Volume Title
Publisher
Publisher

University of Cape Town

License
Series
Abstract
A prefeasibility study for the production of hydroelectricity on the Kruisvallei 190 farm was conducted. The work progression included a site assessment, preliminary layout design, a basic technical specification, and production and financial analyses.
Description

Includes bibliographical references (p. 116-119).

Reference:

Collections