Evaluation of the Factors Causing Cost and Time Overrun in the Namibian Construction Industry

dc.contributor.advisorWindapo, Abimbola
dc.contributor.authorNegussie, Menelik Gizaw
dc.date.accessioned2023-04-13T07:39:16Z
dc.date.available2023-04-13T07:39:16Z
dc.date.issued2022
dc.date.updated2023-04-06T11:49:00Z
dc.description.abstractCost and time are one of the two primary parameters that require due considerations throughout the project lifecycle and are the determining factors for project success. However, it is very common that many projects fail to achieve their goal of being completed within the planned budget and schedule. Several articles on cost and time overrun in the construction industry worldwide, holistically, and locally, were reviewed. However, limited studies were conducted in the Namibian construction industry. It is against this background that this study investigates the factors causing time and cost overrun in the Namibian construction industry and posits strategies to mitigate cost and time overrun on construction projects. The study adopted a quantitative research approach that employs a survey research design in data collection from a sample drawn from a population of professionals in the Namibian construction industry. The survey instrument — a questionnaire — was administered via email. The data collected was analysed using descriptive and inferential statistics comprising of means, percentages, Relative Importance Index (RII) and Spearman Correlation. The study found that five of the main factors contributing to cost overrun on the construction projects in Namibia from a ranking perspective are contractors' financial constraints, inadequate contractor experience, inefficient project planning and scheduling by the contractor, poor site management and delay in progress payment by the client. While the main causes of time overrun were found to consist of inadequate contractor experience, contractor's cashflow difficulty, poor site management and supervision, slow decision making by the client, and deficiency in project planning and scheduling by the contractor. Furthermore, this study revealed that four out of the five factors causing cost and time overrun are related to contractors, while one was client related. The study also found that key strategies proposed to mitigate cost overrun on projects from a ranking perspective include ensuring that consultants submit their drawings and documentations on time, frequent coordination between all the project parties and adequate project planning and scheduling. The key strategies proposed to mitigate time overrun, based on a ranking perspective, are proper planning of the work, adequate and close supervision of the project, and the consultant ensuring that drawings and documentations are submitted on time. Spearman correlation was carried out in order to measure the correlation between top ten rated cost and time overrun factors and construction performance. The result showed that there is positive correlation between cost and time overrun factors against construction performance however it was not statistically significant and this may be due to the small sample size . However, two of the top 10-time overrun factors — which include availability of finance of contractors, deficiency in project planning and scheduling, experience in project planning, late delivery of construction material and equipment, and extension of time claim cost overrun factors — showed a moderate and positive impact on construction performance. Further investigation of the hypothesis may be required. Based on these findings, the study concludes that projects on which an inexperienced contractor is engaged, and for which poor payment regimes exist, will experience time and cost overruns. The study recommends that activities undertaken at the execution stage should be properly monitored to prevent time and cost overruns on the project as a whole.
dc.identifier.apacitationNegussie, M. G. (2022). <i>Evaluation of the Factors Causing Cost and Time Overrun in the Namibian Construction Industry</i>. (). ,Faculty of Engineering and the Built Environment ,Department of Construction Economics and Management. Retrieved from http://hdl.handle.net/11427/37685en_ZA
dc.identifier.chicagocitationNegussie, Menelik Gizaw. <i>"Evaluation of the Factors Causing Cost and Time Overrun in the Namibian Construction Industry."</i> ., ,Faculty of Engineering and the Built Environment ,Department of Construction Economics and Management, 2022. http://hdl.handle.net/11427/37685en_ZA
dc.identifier.citationNegussie, M.G. 2022. Evaluation of the Factors Causing Cost and Time Overrun in the Namibian Construction Industry. . ,Faculty of Engineering and the Built Environment ,Department of Construction Economics and Management. http://hdl.handle.net/11427/37685en_ZA
dc.identifier.ris TY - Master Thesis AU - Negussie, Menelik Gizaw AB - Cost and time are one of the two primary parameters that require due considerations throughout the project lifecycle and are the determining factors for project success. However, it is very common that many projects fail to achieve their goal of being completed within the planned budget and schedule. Several articles on cost and time overrun in the construction industry worldwide, holistically, and locally, were reviewed. However, limited studies were conducted in the Namibian construction industry. It is against this background that this study investigates the factors causing time and cost overrun in the Namibian construction industry and posits strategies to mitigate cost and time overrun on construction projects. The study adopted a quantitative research approach that employs a survey research design in data collection from a sample drawn from a population of professionals in the Namibian construction industry. The survey instrument — a questionnaire — was administered via email. The data collected was analysed using descriptive and inferential statistics comprising of means, percentages, Relative Importance Index (RII) and Spearman Correlation. The study found that five of the main factors contributing to cost overrun on the construction projects in Namibia from a ranking perspective are contractors' financial constraints, inadequate contractor experience, inefficient project planning and scheduling by the contractor, poor site management and delay in progress payment by the client. While the main causes of time overrun were found to consist of inadequate contractor experience, contractor's cashflow difficulty, poor site management and supervision, slow decision making by the client, and deficiency in project planning and scheduling by the contractor. Furthermore, this study revealed that four out of the five factors causing cost and time overrun are related to contractors, while one was client related. The study also found that key strategies proposed to mitigate cost overrun on projects from a ranking perspective include ensuring that consultants submit their drawings and documentations on time, frequent coordination between all the project parties and adequate project planning and scheduling. The key strategies proposed to mitigate time overrun, based on a ranking perspective, are proper planning of the work, adequate and close supervision of the project, and the consultant ensuring that drawings and documentations are submitted on time. Spearman correlation was carried out in order to measure the correlation between top ten rated cost and time overrun factors and construction performance. The result showed that there is positive correlation between cost and time overrun factors against construction performance however it was not statistically significant and this may be due to the small sample size . However, two of the top 10-time overrun factors — which include availability of finance of contractors, deficiency in project planning and scheduling, experience in project planning, late delivery of construction material and equipment, and extension of time claim cost overrun factors — showed a moderate and positive impact on construction performance. Further investigation of the hypothesis may be required. Based on these findings, the study concludes that projects on which an inexperienced contractor is engaged, and for which poor payment regimes exist, will experience time and cost overruns. The study recommends that activities undertaken at the execution stage should be properly monitored to prevent time and cost overruns on the project as a whole. DA - 2022_ DB - OpenUCT DP - University of Cape Town KW - Project Management LK - https://open.uct.ac.za PY - 2022 T1 - Evaluation of the Factors Causing Cost and Time Overrun in the Namibian Construction Industry TI - Evaluation of the Factors Causing Cost and Time Overrun in the Namibian Construction Industry UR - http://hdl.handle.net/11427/37685 ER - en_ZA
dc.identifier.urihttp://hdl.handle.net/11427/37685
dc.identifier.vancouvercitationNegussie MG. Evaluation of the Factors Causing Cost and Time Overrun in the Namibian Construction Industry. []. ,Faculty of Engineering and the Built Environment ,Department of Construction Economics and Management, 2022 [cited yyyy month dd]. Available from: http://hdl.handle.net/11427/37685en_ZA
dc.language.rfc3066eng
dc.publisher.departmentDepartment of Construction Economics and Management
dc.publisher.facultyFaculty of Engineering and the Built Environment
dc.subjectProject Management
dc.titleEvaluation of the Factors Causing Cost and Time Overrun in the Namibian Construction Industry
dc.typeMaster Thesis
dc.type.qualificationlevelMasters
dc.type.qualificationlevelMSc
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
thesis_ebe_2022_negussie menelik gizaw.pdf
Size:
2.59 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
0 B
Format:
Item-specific license agreed upon to submission
Description:
Collections