Political risk management on international construction projects

dc.contributor.advisorWindapo, Abimbolaen_ZA
dc.contributor.authorMuchenga, Isaacen_ZA
dc.date.accessioned2016-07-25T11:24:06Z
dc.date.available2016-07-25T11:24:06Z
dc.date.issued2016en_ZA
dc.description.abstractThis research examines the micro -political risks affecting international construction projects in Namibia and whether these risks are effectively managed. A case study research design was used for the study and the findings were that key threat risks identified in this context were repudiation, contract problems, labour unrest, hostile press, delay in permit approvals while local ownership requirements and expatriate labour restrictions are both threat and opportunity risks . It further emerged that qualitative (heuristic) techniques were commonly used in an ad hoc fashion for risk assessment and that the risk management strategy of cooperation was the most preferred. In addition, evidence suggest s that the execution phase is most prone to micro political risk. A significant number of the micro -political risks identified arise from the host government, while the balance arise from the host society. These findings are likely to apply to other international construction projects in Namibia and have serious implication s for the role of government in the success or failure of infrastructural projects which are badly needed for national development. Therefore, the Namibian Government can positively contribute through introduction of regulations, laws or amendments to laws that enhance opportunities, minimise downside risk, and thereby reduce overall construction costs on international construction projects in the country. It is recommended that systematic risk management in which both qualitative and quantitative techniques are used for risk assessment, be adopted in dealing with micro political risks associated with international construction projects in Namibia. Additionally, tertiary institutions offering risk management training need to focus on qualitative methods to facilitate maximum benefit when these methods are applied by their graduates. The existence of both threat s and opportunities in the micro -political risk environment in international construction means contractors in international construction need to be on the lookout for downside risks as well as opportunities.en_ZA
dc.identifier.apacitationMuchenga, I. (2016). <i>Political risk management on international construction projects</i>. (Thesis). University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Construction Economics and Management. Retrieved from http://hdl.handle.net/11427/20676en_ZA
dc.identifier.chicagocitationMuchenga, Isaac. <i>"Political risk management on international construction projects."</i> Thesis., University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Construction Economics and Management, 2016. http://hdl.handle.net/11427/20676en_ZA
dc.identifier.citationMuchenga, I. 2016. Political risk management on international construction projects. University of Cape Town.en_ZA
dc.identifier.ris TY - Thesis / Dissertation AU - Muchenga, Isaac AB - This research examines the micro -political risks affecting international construction projects in Namibia and whether these risks are effectively managed. A case study research design was used for the study and the findings were that key threat risks identified in this context were repudiation, contract problems, labour unrest, hostile press, delay in permit approvals while local ownership requirements and expatriate labour restrictions are both threat and opportunity risks . It further emerged that qualitative (heuristic) techniques were commonly used in an ad hoc fashion for risk assessment and that the risk management strategy of cooperation was the most preferred. In addition, evidence suggest s that the execution phase is most prone to micro political risk. A significant number of the micro -political risks identified arise from the host government, while the balance arise from the host society. These findings are likely to apply to other international construction projects in Namibia and have serious implication s for the role of government in the success or failure of infrastructural projects which are badly needed for national development. Therefore, the Namibian Government can positively contribute through introduction of regulations, laws or amendments to laws that enhance opportunities, minimise downside risk, and thereby reduce overall construction costs on international construction projects in the country. It is recommended that systematic risk management in which both qualitative and quantitative techniques are used for risk assessment, be adopted in dealing with micro political risks associated with international construction projects in Namibia. Additionally, tertiary institutions offering risk management training need to focus on qualitative methods to facilitate maximum benefit when these methods are applied by their graduates. The existence of both threat s and opportunities in the micro -political risk environment in international construction means contractors in international construction need to be on the lookout for downside risks as well as opportunities. DA - 2016 DB - OpenUCT DP - University of Cape Town LK - https://open.uct.ac.za PB - University of Cape Town PY - 2016 T1 - Political risk management on international construction projects TI - Political risk management on international construction projects UR - http://hdl.handle.net/11427/20676 ER - en_ZA
dc.identifier.urihttp://hdl.handle.net/11427/20676
dc.identifier.vancouvercitationMuchenga I. Political risk management on international construction projects. [Thesis]. University of Cape Town ,Faculty of Engineering & the Built Environment ,Department of Construction Economics and Management, 2016 [cited yyyy month dd]. Available from: http://hdl.handle.net/11427/20676en_ZA
dc.language.isoengen_ZA
dc.publisher.departmentDepartment of Construction Economics and Managementen_ZA
dc.publisher.facultyFaculty of Engineering and the Built Environment
dc.publisher.institutionUniversity of Cape Town
dc.subject.otherProject Managementen_ZA
dc.titlePolitical risk management on international construction projectsen_ZA
dc.typeMaster Thesis
dc.type.qualificationlevelMasters
dc.type.qualificationnameMScen_ZA
uct.type.filetypeText
uct.type.filetypeImage
uct.type.publicationResearchen_ZA
uct.type.resourceThesisen_ZA
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
thesis_ebe_2016_muchenga_isaac (1).pdf
Size:
3.13 MB
Format:
Adobe Portable Document Format
Description:
Collections