Fullscale implementation of external nitrification biological nutrient removal in the Daspoort Water Care Works

dc.contributor.authorMuller, A W
dc.contributor.authorWentzel, M C
dc.contributor.authorSaayman, G B
dc.contributor.authorVan de Merwe, S A
dc.contributor.authorEsterhuyse, C M
dc.contributor.authorSnyman, J S
dc.contributor.authorEkama, G A
dc.date.accessioned2018-01-16T09:52:50Z
dc.date.available2018-01-16T09:52:50Z
dc.date.issued2004
dc.date.updated2017-11-15T08:26:03Z
dc.description.abstractIn the external nitrification (EN) biological nutrient removal (BNR) activated sludge (AS) system, the nitrification process is removed from the main BNRAS system to a fixed media system external to the AS system (Hu et al., 2003). The ENBNRAS system provides considerable advantages over the conventional BNRAS system, e.g. reduced bioreactor volumes, secondary settling tank surface area and oxygen demand. Further, the ENBNRAS system provides opportunity for substantial system intensification. The performance and characterization of the ENBNRAS system has been successfully demonstrated at lab-scale (Hu et al., 2000, Sötemann et al., 2002), but has not yet been tested in full-scale implementation. In collaboration between the City of Tshwane Metropolitan Municipality (CTMM) and the University of Cape Town, ENBNR activated sludge is being implemented at fullscale at the Daspoort Waste Water Treatment Works (DWWTW) in Central Pretoria, South Africa. This paper describes the preliminary design of this full-scale plant and initial implementation.
dc.identifier.apacitationMuller, A. W., Wentzel, M. C., Saayman, G. B., Van de Merwe, S. A., Esterhuyse, C. M., Snyman, J. S., & Ekama, G. A. (2004). Fullscale implementation of external nitrification biological nutrient removal in the Daspoort Water Care Works. <i>Water SA</i>, http://hdl.handle.net/11427/26825en_ZA
dc.identifier.chicagocitationMuller, A W, M C Wentzel, G B Saayman, S A Van de Merwe, C M Esterhuyse, J S Snyman, and G A Ekama "Fullscale implementation of external nitrification biological nutrient removal in the Daspoort Water Care Works." <i>Water SA</i> (2004) http://hdl.handle.net/11427/26825en_ZA
dc.identifier.citationMuller, A. W., Wentzel, M. C., Saayman, G. B., Van de Merwe, S. A., Esterhuyse, C. M., Snyman, J. S., & Ekama, G. A. (2004). Full-scale implementation of external nitrification biological nutrient removal at the Daspoort Waste Water Treatment Works. Water SA, 30(5), 37-43.
dc.identifier.ris TY - Journal Article AU - Muller, A W AU - Wentzel, M C AU - Saayman, G B AU - Van de Merwe, S A AU - Esterhuyse, C M AU - Snyman, J S AU - Ekama, G A AB - In the external nitrification (EN) biological nutrient removal (BNR) activated sludge (AS) system, the nitrification process is removed from the main BNRAS system to a fixed media system external to the AS system (Hu et al., 2003). The ENBNRAS system provides considerable advantages over the conventional BNRAS system, e.g. reduced bioreactor volumes, secondary settling tank surface area and oxygen demand. Further, the ENBNRAS system provides opportunity for substantial system intensification. The performance and characterization of the ENBNRAS system has been successfully demonstrated at lab-scale (Hu et al., 2000, Sötemann et al., 2002), but has not yet been tested in full-scale implementation. In collaboration between the City of Tshwane Metropolitan Municipality (CTMM) and the University of Cape Town, ENBNR activated sludge is being implemented at fullscale at the Daspoort Waste Water Treatment Works (DWWTW) in Central Pretoria, South Africa. This paper describes the preliminary design of this full-scale plant and initial implementation. DA - 2004 DB - OpenUCT DP - University of Cape Town J1 - Water SA LK - https://open.uct.ac.za PB - University of Cape Town PY - 2004 T1 - Fullscale implementation of external nitrification biological nutrient removal in the Daspoort Water Care Works TI - Fullscale implementation of external nitrification biological nutrient removal in the Daspoort Water Care Works UR - http://hdl.handle.net/11427/26825 ER - en_ZA
dc.identifier.urihttp://hdl.handle.net/11427/26825
dc.identifier.vancouvercitationMuller AW, Wentzel MC, Saayman GB, Van de Merwe SA, Esterhuyse CM, Snyman JS, et al. Fullscale implementation of external nitrification biological nutrient removal in the Daspoort Water Care Works. Water SA. 2004; http://hdl.handle.net/11427/26825.en_ZA
dc.language.isoeng
dc.publisher.departmentDepartment of Civil Engineeringen_ZA
dc.publisher.facultyFaculty of Engineering and the Built Environment
dc.publisher.institutionUniversity of Cape Town
dc.sourceWater SA
dc.source.urihttps://www.ajol.info/index.php/wsa/index
dc.titleFullscale implementation of external nitrification biological nutrient removal in the Daspoort Water Care Works
dc.typeJournal Article
uct.type.filetypeText
uct.type.filetypeImage
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Muller_Article_2004.pdf
Size:
87.86 KB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.72 KB
Format:
Item-specific license agreed upon to submission
Description:
Collections