An investigation of the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings: A case study of Perseverance Industrial Township, Nelson Mandela Bay

dc.contributor.advisorMichell, Kathleen
dc.contributor.authorBailey, Anelle
dc.date.accessioned2023-03-13T14:03:57Z
dc.date.available2023-03-13T14:03:57Z
dc.date.issued2022
dc.date.updated2023-02-20T12:14:48Z
dc.description.abstractNelson Mandela Bay Municipality (NMBM) made the decision in 2008 to exempt industrial areas from load-shedding to avoid job losses. However, during 2019, when South Africa was experiencing prevalent periods of load-shedding, residents, and small business owners in other areas, protested this. On the 9th of December 2019, Eskom announced on Twitter, and implemented Stage 6 loadshedding for the first time (Eskom, 2019), and subsequently on the 11th of December 2019, NMBM posted new load-shedding schedules for Stages 5 to 8, which included the previously excluded industrial areas, including Perseverance, a suburb of Gqeberha (Port Elizabeth) in the district of Nelson Mandela Bay (NMB) with uninterrupted and preferential electricity supply since 2000. As Industries in Perseverance have not been subjected to load-shedding since load-shedding commenced, the enterprises in Perseverance have not been incentivized to make allowance and/or budget for, any interruption to their industrial activities. The nature of many of the industries that subsequently invested in Perseverance, were industries, that are dependent on uninterrupted electricity, to manufacture their products cost effectively, and without harm to their employees or the environment. This research aimed to investigate the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings, with a case study focused on Perseverance. An overarching qualitative case study with an embedded convergent parallel mixed method design, consisting of 20 quantitative survey questionnaires from participants in Perseverance and 11 qualitative semi-structured interviews with facility managers, plant engineers and/or managing directors of enterprises in Perseverance. A further 14 quantitative survey questionnaires were received from enterprises in the remainder of NMB. The findings revealed the shock and concern from facility managers to the threat of potential electrical load-shedding and revealed the operational and strategic decisions that was considered, since December 2019 as well as their way forward to manage the threat of electrical load-shedding in Perseverance. It was also revealed that sustained transparent communication needs to be initiated between industrialists and NMBM.
dc.identifier.apacitationBailey, A. (2022). <i>An investigation of the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings: A case study of Perseverance Industrial Township, Nelson Mandela Bay</i>. (). ,Faculty of Engineering and the Built Environment ,Department of Construction Economics and Management. Retrieved from http://hdl.handle.net/11427/37421en_ZA
dc.identifier.chicagocitationBailey, Anelle. <i>"An investigation of the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings: A case study of Perseverance Industrial Township, Nelson Mandela Bay."</i> ., ,Faculty of Engineering and the Built Environment ,Department of Construction Economics and Management, 2022. http://hdl.handle.net/11427/37421en_ZA
dc.identifier.citationBailey, A. 2022. An investigation of the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings: A case study of Perseverance Industrial Township, Nelson Mandela Bay. . ,Faculty of Engineering and the Built Environment ,Department of Construction Economics and Management. http://hdl.handle.net/11427/37421en_ZA
dc.identifier.ris TY - Master Thesis AU - Bailey, Anelle AB - Nelson Mandela Bay Municipality (NMBM) made the decision in 2008 to exempt industrial areas from load-shedding to avoid job losses. However, during 2019, when South Africa was experiencing prevalent periods of load-shedding, residents, and small business owners in other areas, protested this. On the 9th of December 2019, Eskom announced on Twitter, and implemented Stage 6 loadshedding for the first time (Eskom, 2019), and subsequently on the 11th of December 2019, NMBM posted new load-shedding schedules for Stages 5 to 8, which included the previously excluded industrial areas, including Perseverance, a suburb of Gqeberha (Port Elizabeth) in the district of Nelson Mandela Bay (NMB) with uninterrupted and preferential electricity supply since 2000. As Industries in Perseverance have not been subjected to load-shedding since load-shedding commenced, the enterprises in Perseverance have not been incentivized to make allowance and/or budget for, any interruption to their industrial activities. The nature of many of the industries that subsequently invested in Perseverance, were industries, that are dependent on uninterrupted electricity, to manufacture their products cost effectively, and without harm to their employees or the environment. This research aimed to investigate the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings, with a case study focused on Perseverance. An overarching qualitative case study with an embedded convergent parallel mixed method design, consisting of 20 quantitative survey questionnaires from participants in Perseverance and 11 qualitative semi-structured interviews with facility managers, plant engineers and/or managing directors of enterprises in Perseverance. A further 14 quantitative survey questionnaires were received from enterprises in the remainder of NMB. The findings revealed the shock and concern from facility managers to the threat of potential electrical load-shedding and revealed the operational and strategic decisions that was considered, since December 2019 as well as their way forward to manage the threat of electrical load-shedding in Perseverance. It was also revealed that sustained transparent communication needs to be initiated between industrialists and NMBM. DA - 2022_ DB - OpenUCT DP - University of Cape Town KW - Property Studies LK - https://open.uct.ac.za PY - 2022 T1 - An investigation of the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings: A case study of Perseverance Industrial Township, Nelson Mandela Bay TI - An investigation of the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings: A case study of Perseverance Industrial Township, Nelson Mandela Bay UR - http://hdl.handle.net/11427/37421 ER - en_ZA
dc.identifier.urihttp://hdl.handle.net/11427/37421
dc.identifier.vancouvercitationBailey A. An investigation of the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings: A case study of Perseverance Industrial Township, Nelson Mandela Bay. []. ,Faculty of Engineering and the Built Environment ,Department of Construction Economics and Management, 2022 [cited yyyy month dd]. Available from: http://hdl.handle.net/11427/37421en_ZA
dc.language.rfc3066eng
dc.publisher.departmentDepartment of Construction Economics and Management
dc.publisher.facultyFaculty of Engineering and the Built Environment
dc.subjectProperty Studies
dc.titleAn investigation of the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings: A case study of Perseverance Industrial Township, Nelson Mandela Bay
dc.typeMaster Thesis
dc.type.qualificationlevelMasters
dc.type.qualificationlevelMSc
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
thesis_ebe_2022_bailey anelle.pdf
Size:
5.55 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
0 B
Format:
Item-specific license agreed upon to submission
Description:
Collections