Simultaneous nitrogen and phosphorus removal in the sulfur cycle-associated enhanced biological phosphorus removal (EBPR) process
Journal Article
2014
Permanent link to this Item
Authors
Journal Title
Water Research
Link to Journal
Journal ISSN
Volume Title
Publisher
Publisher
University of Cape Town
Department
License
Series
Abstract
Hong Kong has practiced seawater toilet flushing since 1958, saving 750,000 m3 of freshwater every day. A high sulfate-to-COD ratio (>1.25 mg SO42−/mg COD) in the saline sewage resulting from this practice has enabled us to develop the Sulfate reduction, Autotrophic denitrification and Nitrification Integrated (SANI®) process with minimal sludge production and oxygen demand. Recently, the SANI® process has been expanded to include Enhanced Biological Phosphorus Removal (EBPR) in an alternating anaerobic/limited-oxygen (LOS-EBPR) aerobic sequencing batch reactor (SBR). This paper presents further development – an anaerobic/anoxic denitrifying sulfur cycle-associated EBPR, named as DS-EBPR, bioprocess in an alternating anaerobic/anoxic SBR for simultaneous removal of organics, nitrogen and phosphorus. The 211 day SBR operation confirmed the sulfur cycle-associated biological phosphorus uptake utilizing nitrate as electron acceptor. This new bioprocess cannot only reduce operation time but also enhance volumetric loading of SBR compared with the LOS-EBPR. The DS-EBPR process performed well at high temperatures of 30 °C and a high salinity of 20% seawater. A synergistic relationship may exist between sulfur cycle and biological phosphorus removal as the optimal ratio of P-release to SO42−-reduction is close to 1.0 mg P/mg S. There were no conventional PAOs in the sludge.
Description
Keywords
Reference:
Wu, D., Ekama, G. A., Wang, H., Wei, L., Lu, H., Chui, H., . . . Chen, G. (2014). Simultaneous nitrogen and phosphorus removal in the sulfur cycle-associated Enhanced Biological Phosphorus Removal (EBPR) process. Water Research, 49, 251-264. doi:10.1016/j.watres.2013.11.029