The effect of steam generator tube plugging on its overall thermal performance - A Systems CFD-Based Study

dc.contributor.advisorMalan, Arnaud
dc.contributor.authorNtuli, Japhet Mkhipheni Ali
dc.date.accessioned2020-02-06T12:01:44Z
dc.date.available2020-02-06T12:01:44Z
dc.date.issued2019
dc.date.updated2020-02-04T06:59:35Z
dc.description.abstractThe steam generator in a pressurized water reactor power plant acts as a fission product barrier between primary and secondary system. Material failure of the tube bundle barrier could therefore lead to a release of radioactive product into the secondary side. Several repair methods have been used to address tube leakage, with the most popular being tube plugging. The objective of this study was to quantify the effect of tube plugging on the thermal performance of a steam generator. For this purpose, the systems computational fluid dynamics (CFD) software Flownex® was used. First, a Flownex® model of the steam generator was developed and validated via comparison of the results to a validated model from the literature. Following this, a hydro-thermal analysis was performed to determine the effect of the tube plugging on the thermal performance under normal operational conditions (excluding the possibility of a tube rupture). Tube plugging of up to 20% was investigated. The model predicted the following effects: decrease in heat transfer, primary coolant mass flowrate and primary outlet pressure. Further, primary flow velocity, pressure drop and outlet temperature increase with increasing tube plugging. On the secondary side, tube plugging lowers the mixture quality in the boiling region and steam production while the re-circulation ratio was increased. Lastly, the model predicted a plugging ratio limit of 17.3%. Beyond this point, the steam generator does not extract sufficient heat from the reactor at 100% power.
dc.identifier.apacitationNtuli, J. M. A. (2019). <i>The effect of steam generator tube plugging on its overall thermal performance - A Systems CFD-Based Study</i>. (). ,Engineering and the Built Environment ,Department of Electrical Engineering. Retrieved from http://hdl.handle.net/11427/30888en_ZA
dc.identifier.chicagocitationNtuli, Japhet Mkhipheni Ali. <i>"The effect of steam generator tube plugging on its overall thermal performance - A Systems CFD-Based Study."</i> ., ,Engineering and the Built Environment ,Department of Electrical Engineering, 2019. http://hdl.handle.net/11427/30888en_ZA
dc.identifier.citationNtuli, J. 2019. The effect of steam generator tube plugging on its overall thermal performance - A Systems CFD-Based Study.en_ZA
dc.identifier.ris TY - Thesis / Dissertation AU - Ntuli, Japhet Mkhipheni Ali AB - The steam generator in a pressurized water reactor power plant acts as a fission product barrier between primary and secondary system. Material failure of the tube bundle barrier could therefore lead to a release of radioactive product into the secondary side. Several repair methods have been used to address tube leakage, with the most popular being tube plugging. The objective of this study was to quantify the effect of tube plugging on the thermal performance of a steam generator. For this purpose, the systems computational fluid dynamics (CFD) software Flownex® was used. First, a Flownex® model of the steam generator was developed and validated via comparison of the results to a validated model from the literature. Following this, a hydro-thermal analysis was performed to determine the effect of the tube plugging on the thermal performance under normal operational conditions (excluding the possibility of a tube rupture). Tube plugging of up to 20% was investigated. The model predicted the following effects: decrease in heat transfer, primary coolant mass flowrate and primary outlet pressure. Further, primary flow velocity, pressure drop and outlet temperature increase with increasing tube plugging. On the secondary side, tube plugging lowers the mixture quality in the boiling region and steam production while the re-circulation ratio was increased. Lastly, the model predicted a plugging ratio limit of 17.3%. Beyond this point, the steam generator does not extract sufficient heat from the reactor at 100% power. DA - 2019 DB - OpenUCT DP - University of Cape Town KW - Engineering LK - https://open.uct.ac.za PY - 2019 T1 - The effect of steam generator tube plugging on its overall thermal performance - A Systems CFD-Based Study TI - The effect of steam generator tube plugging on its overall thermal performance - A Systems CFD-Based Study UR - http://hdl.handle.net/11427/30888 ER - en_ZA
dc.identifier.urihttp://hdl.handle.net/11427/30888
dc.identifier.vancouvercitationNtuli JMA. The effect of steam generator tube plugging on its overall thermal performance - A Systems CFD-Based Study. []. ,Engineering and the Built Environment ,Department of Electrical Engineering, 2019 [cited yyyy month dd]. Available from: http://hdl.handle.net/11427/30888en_ZA
dc.language.rfc3066eng
dc.publisher.departmentDepartment of Electrical Engineering
dc.publisher.facultyFaculty of Engineering and the Built Environment
dc.subjectEngineering
dc.titleThe effect of steam generator tube plugging on its overall thermal performance - A Systems CFD-Based Study
dc.typeMaster Thesis
dc.type.qualificationlevelMasters
dc.type.qualificationnameMSc (Eng)
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
thesis_ebe_2019_ntuli_japhet_mkhipheni_ali.pdf
Size:
8.78 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
0 B
Format:
Item-specific license agreed upon to submission
Description:
Collections