Analysis of tender sum forecasting by quantity surveyors and contractors in South Africa

Journal Article

2003

Permanent link to this Item
Authors
Journal Title

Acta Structilia

Journal ISSN
Volume Title
Publisher
Publisher

University of Cape Town

License
Series
Abstract
Although extensive research has been undertaken on the accuracy of quantity surveyors' tender price forecasts, very little of this research contains information relating to the factors affecting tender sum forecasting by quantity surveyors and contractors. The primary objective of this empirical study was to gain insight into the factors influencing both quantity surveyors' and contractors' tender price forecasts. This was achieved through an analysis of tender information relating to 278 projects for a fifteen-year period and collected from 30 quantity-surveying practices and MBATA tender records. The analysis of South African tender information reported in this article indicates an average forecast performance by quantity surveyors of 8.33% (std dev (standard deviation) = 11,183, CV (coefficient of variation) = 134,2%). The variability of contractors' tenders ranged from 0,37% to 46,53%, with a mean of 5,65% (std dev = 5,22, SE (standard error) = 0,313). Furthermore, there is no evidence to suggest that forecast performance is dependent on type of project, client, function of project, size of project, location of project and number of bidders. The contractor's results suggest that local authority projects are associated with high variability of their tender sum forecasts. The only factor, which shows significance for quantity surveyors, is the date of tender which may tend to point to the importance of market conditions and economic cycle in the tender sum forecast performance of South African quantity surveyors.
Description

Reference:

Collections